Compass โ CHE Analytics Page Guide
A performance and deployment view of Container Handling Equipment (CHE): utilization, productivity, and flow efficiency across vessel, yard, and gate operations.
Historical / Near Real-Time ยท Source: TOS
---
What this page is for
The CHE Analytics page provides visibility on how effectively equipment (mainly RTGs) is utilized, deployed, and performing across operations.
It is used to:
- Monitor equipment productivity (LPH)
- Validate deployment vs operational demand
- Identify bottlenecks in yard and transport flow
- Support resource optimization and process improvement
---
Key Performance Indicators
Equipment Utilization
RTG Utilization Percentage of time RTGs are actively used
๐ Low utilization = underused assets ๐ High utilization = risk of congestion
---
Equipment Productivity
RTG LPH (Lifts Per Hour) Moves รท Equipment Running Hours
- Overall โ Total RTG productivity
- Vessel โ Support to quay operations
- Gate โ Support to landside flow
---
Equipment Deployment
RTG Deployment Ratio (Vessel) Alignment of RTGs deployed vs vessel demand
๐ Validates if yard support matches quay activity
---
RTG Deployment Overall Average RTGs deployed across operations
๐ Indicates allocation efficiency
---
Yard Interface Points
Loading Points Number of active positions supporting loading operations
Discharging Points Number of active positions supporting discharge operations
๐ High values may indicate:
- Fragmented operations
- Inefficient stacking strategy
---
Flow Efficiency
Moves Before Gantry Number of preparatory moves before execution
- Load / Discharge split available
๐ High values indicate:
- Rehandles
- Poor yard planning
- Inefficient stacking
---
Trend Analysis
RTG LPH Weekly Trend
Tracks productivity evolution over time
๐ Use to:
- Identify performance degradation
- Validate improvement actions
---
How to use this page
Daily / Shift Operations
- Monitor:
- RTG utilization
- LPH performance
- Adjust:
- Equipment deployment
- Yard allocation
---
Weekly Review / SQDC
- Compare:
- Vessel vs Gate performance
- Identify:
- Bottlenecks in yard flow
- Under/over-utilization
---
Process Confirmation
- Validate:
- RTG deployment matches demand
- Yard strategy supports quay productivity
---
Continuous Improvement (Kaizen)
Focus on:
- High Moves Before Gantry โ reduce rehandles
- Imbalance between:
- Vessel and Gate LPH
- Suboptimal deployment
๐ Translate into:
- Yard planning improvements
- Equipment allocation rules
- Standard work adjustments
---
Performance Logic
- Green โ On or above target
- Red โ Below target
๐ For utilization:
- Too low = inefficiency
- Too high = congestion risk
---
Filters & Controls
- Time โ Year / Month / Week
- Vessel / Service โ Operational segmentation
---
Important Notes
System view:
This page reflects yard + transport performance, not quay
Balance is key:
Optimizing RTG performance requires balance between utilization, deployment, and flow
Focus:
Do not optimize one KPI in isolation (e.g. LPH vs utilization)
---
APM Terminals ยท Compass Platform ยท CHE Analytics Page Guide ยท v1.0 ``