Compass — Executed Operations Page Guide
A consolidated reporting view of completed vessel calls: plan vs actual performance, productivity, and port stay — filterable by week, month, service, or vessel.
Historical · Source: TOS + COMS
---
What this page is for
The Executed Operations page provides a post-call performance overview of completed vessel operations. It enables tracking of execution vs plan, vessel comparison, and trend analysis across periods.
---
Main Table — Vessel Performance Summary
Each row represents a completed vessel call with key execution metrics.
Core Volume Metrics
- Planned Moves → Moves expected from vessel programme
- Executed Moves → Moves confirmed in TOS
- Restows / Load / Discharge → Move split by type
- Total TEUs → Total volume handled
---
Productivity KPIs
PMPH — Port Moves Per Hour Moves ÷ Port Hours (All Fast → Last Line) Overall berth productivity (customer KPI)
CMPH — Crane Moves Per Hour Moves ÷ Total Crane Hours Average crane productivity
---
Crane Deployment
CI — Crane Intensity Total Crane Hours ÷ Vessel Working Hours Average cranes deployed during the call
---
Time Performance
Port Stay Total time from All Fast to Last Line
PHS — Port Hours Saved Target Port Hours − Actual Port Hours
- Positive = ahead of target ✅
- Negative = delay ❌
---
Cycle Time & Losses
Cycle Time Average time per move (seconds)
Muda Operational waiting losses (truck, yard, etc.)
Incidental Work Supporting crane activities (e.g. hatch covers)
---
Performance Colour Logic
- Green → Actual ≥ Plan
- Red → Actual < Plan
- Time KPIs reversed: lower is better (cycle time, muda)
---
Filters & Controls
- Time → Year / Month / Week
- Scope → Vessel / Service / Phase
- Sort → Click column headers
- Export → Download dataset
---
How to use this page
Weekly / Management
- Identify underperforming vessels
- Compare services and call sizes
- Detect inefficiencies (high Muda, high cycle time)
Operational Review
- Validate execution vs plan
- Check gaps in:
- CI
- CMPH / PMPH
- PHS
---
Important Notes
Completed calls only: Post-execution data only
Data accuracy: Depends on TOS move and delay logging
Plan reference: Based on vessel programme snapshot
---
APM Terminals · Compass Platform · Executed Operations Page Guide · v1.0
